• Advert Rates
  • Careers
  • About Us
  • Contact Us
  • Digital Store
Wednesday, August 26, 2026
The Trumpet Newspaper Nigeria
No Result
View All Result
  • Home
  • News
    • Breaking News
    • Headlines
    • Metro
    • Health
  • Politics
  • Business
    • Ecommerce
    • Economy
    • Start-up
  • Entertainment
  • Sports
  • Opinion
    • Religion
    • Columnists
    • Contributors
    • Editorial
  • Global
    • Climate
    • Culture
    • Tourism
    • Technology
    • Weather
    • Social Media
  • e-Edition
  • Home
  • News
    • Breaking News
    • Headlines
    • Metro
    • Health
  • Politics
  • Business
    • Ecommerce
    • Economy
    • Start-up
  • Entertainment
  • Sports
  • Opinion
    • Religion
    • Columnists
    • Contributors
    • Editorial
  • Global
    • Climate
    • Culture
    • Tourism
    • Technology
    • Weather
    • Social Media
  • e-Edition
No Result
View All Result
The Trumpet Newspaper Nigeria
No Result
View All Result
ADVERTISEMENT
Home News

Benin-Asaba Expressway Crisis: Who Owns the Concession and Why Is the Road in Trouble?

Obah Sylva by Obah Sylva
August 26, 2026
in News
Reading Time: 8 mins read
0
Abia community bans hard drugs, cultism, orders criminals out
0
SHARES
9
VIEWS
Share on FacebookShare on TwitterShare on LinkedinShare on WhatsAppShare on Pinterest

The Benin-Asaba Expressway has become the centre of growing public anger after prolonged gridlock, deteriorating road conditions and criticism of the concessionaire’s handling of reconstruction works. The 125-kilometre corridor is operated under a 25-year concession awarded through the Federal Government’s Highway Development and Management Initiative (HDMI), with Benin-Asaba Expressway Concession Company Limited (BAECC) serving as the special-purpose vehicle responsible for the project.

Key Highlightse

  • BAECC holds a 25-year concession for the Benin-Asaba Expressway.
  • The project is backed primarily by Africa Plus Partners Nigeria Limited Consortium.
  • Other key institutions linked to the financing structure include Triple A Infrastructure and InfraCorp.
  • The concession is designed to be funded through private capital and future toll revenues rather than direct government construction funding.
  • Works began in earnest in 2025, with completion originally targeted within about 30 months.
  • The project has faced criticism over poor drainage, asphalt removal, flooding and prolonged traffic gridlock.
  • Works Minister David Umahi has accused the concessionaire of lacking sufficient technical capacity.
  • The Federal Government is reviewing the situation while legal and contractual issues surrounding the concession remain.

 Who owns the Benin-Asaba Expressway concession?

The special-purpose vehicle responsible for the project is Benin-Asaba Expressway Concession Company Limited (BAECC).

ADVERTISEMENT

BAECC is responsible for the rehabilitation, reconstruction, operation and maintenance of the approximately 125-kilometre road linking the AIF Roundabout and King’s Square area in Benin City, Edo State, with Summit Junction in Asaba, Delta State.

The project forms part of the Federal Government’s Highway Development and Management Initiative, introduced to attract private capital into the development and long-term management of major highways through public-private partnerships.

The Federal Executive Council approved the concession in 2023, while further agreements and handover arrangements followed in subsequent years. Site works and the formal flag-off of the project took place in March 2025.

Under the arrangement, the concessionaire is expected to finance the project, operate the road and recover its investment through tolling over the 25-year concession period.

How much will the Benin-Asaba Expressway project cost?

Various estimates have placed the cost of the project between N200 billion and N228 billion, although some figures cited publicly have been higher.

The proposed reconstruction is expected to transform the existing corridor into a wider and safer dual carriageway, with sections reportedly designed to accommodate as many as 10 lanes, alongside service lanes in urban areas.

The plans also include solar-powered street lighting, improved drainage, enhanced road safety infrastructure and other facilities.

The concessionaire had previously indicated a construction period of about 30 months, with completion expected around September 2027. The project has since been divided into phases, with an earlier target of completing the first approximately 65 kilometres by April 2027.

Who is behind BAECC?

The principal consortium behind the concession is Africa Plus Partners Nigeria Limited (APPNL) and associated infrastructure investment entities.

Africa Plus Partners

Africa Plus Partners is an infrastructure fund and asset management company focused on investment in infrastructure projects in Nigeria and sub-Saharan Africa.

The company has been associated with infrastructure funds including Africa Infrastructure Partners Fund I and II.

Read also:

  • Delta State Government Converts Model Technical College, Omadino, into Campus of Federal Polytechnic Orogun
  • Oborevwori Appoints Sakpra As GM Delta Social  Investment Programme
  •  Governor Oborevwori Describes Olu Of Warri 5-Year Reign As Period Of Glory, Peace, Progress

Its leadership includes Anhad Narula, who has an engineering background and experience in infrastructure investment, and Niran Ajakaiye, who serves in a senior investment management role.

The company’s focus is primarily on investment, project development, governance and infrastructure financing.

Triple A Infrastructure

Triple A Infrastructure Nigeria Limited is another important part of the investment structure.

The company is associated with Afrinvest West Africa, Africa Plus Partners and ARC Asset Management.

Afrinvest Group Managing Director Ike Chioke has a civil engineering background and extensive experience in investment banking, corporate finance, mergers and acquisitions and project finance.

The distinction is important because the consortium’s principal strength is in infrastructure finance and investment, rather than conventional road construction contracting.

InfraCorp

The project is also linked to Infrastructure Corporation of Nigeria (InfraCorp), a major infrastructure investment vehicle promoted by the Central Bank of Nigeria, the Nigeria Sovereign Investment Authority and the Africa Finance Corporation.

InfraCorp was established to mobilise large-scale private capital for infrastructure development across Nigeria.

Edo State Government

The Edo State Government also became an equity partner in the project under an agreement reached during the administration of former Governor Godwin Obaseki.

The state has a significant interest in the project because roughly 60 kilometres of the corridor falls within Edo State.

 Are the concessionaires road contractors?

This is one of the central issues raised by the controversy.

The principal organisations behind the concession are primarily infrastructure financiers, investment managers and project developers rather than traditional engineering, procurement and construction companies with long-established records of constructing major Nigerian highways.

Their role under the HDMI arrangement is largely to mobilise capital, structure the concession, manage the investment and oversee project delivery.

Construction and engineering capacity can therefore be sourced through technical partners and contractors.

However, the arrangement has come under scrutiny because of questions about the technical capacity available on the project.

 What did David Umahi say about the project?

The Minister of Works, David Umahi, has strongly criticised the handling of the Benin-Asaba Expressway project.

During assessments of the road on 25th of  August 2026, Umahi accused the concessionaire of lacking sufficient technical knowledge, competent technical personnel and the construction expertise required to manage a project of such importance.

He also criticised the removal of existing asphalt without adequate drainage works being completed first.

Project consultants reportedly raised similar concerns, particularly over the failure to prioritise drainage before removing sections of the existing road pavement.

The minister described the situation as a serious failure in project execution and warned that the government would review the concession arrangements.

Why has the Benin-Asaba Expressway become a major crisis?

The controversy intensified after sections of the road deteriorated badly during reconstruction.

According to government officials and reports from the corridor, existing asphalt was removed in some areas before adequate drainage infrastructure had been completed.

Heavy rainfall, high traffic volumes and incomplete drainage subsequently contributed to flooding, muddy road surfaces, failed sections and severe traffic congestion.

Motorists have reportedly spent extended periods trapped in traffic along parts of the Benin-Agbor corridor.

The deterioration has generated protests by residents and motorists demanding urgent intervention.

Communities and businesses affected by road works have also raised concerns over demolitions, access restrictions and disruptions to commercial activity.

Government faces difficult decision over concession

Despite the criticism, terminating the concession immediately is not necessarily straightforward.

The project is governed by contractual arrangements between the government and private investors. Abrupt termination could expose the government to litigation and compensation claims.

The Federal Government has therefore been reviewing its options while engaging the concessionaire.

Temporary interventions involving other contractors have also been considered to restore motorability on badly affected sections while the larger reconstruction continues.

The government has also indicated that other institutions, including the Niger Delta Development Commission, could play a role in emergency interventions where necessary.

What has BAECC said?

BAECC has maintained that it remains committed to the Benin-Asaba Expressway project.

The concessionaire has pointed to its private investment in the corridor, the challenges posed by heavy rainfall and traffic volumes, as well as ongoing palliative works.

The company has also outlined a phased approach to the project and appealed for cooperation from motorists, communities and other stakeholders.

The dispute, however, has raised wider questions about how Nigeria selects private companies to manage major public infrastructure projects.

The bigger question over Nigeria’s highway concessions

The Benin-Asaba Expressway has become an important test of Nigeria’s attempt to use private capital to develop and maintain major highways.

The HDMI model was designed to reduce the pressure on government budgets by allowing private investors to finance infrastructure and recover their investment over time.

The arrangement also places responsibility for long-term maintenance on concessionaires.

The current controversy raises questions about whether financial capacity should be matched by clearly demonstrated technical and construction capacity before major highway concessions are awarded.

For motorists and communities along the Benin-Asaba corridor, however, the immediate concern is simpler: when will the road become reliably motorable again?

As of August 2026, the financing structure behind the concession remains in place, but the project faces intense government scrutiny over technical execution, drainage, traffic management and the pace of construction.

The outcome could influence not only the future of the Benin-Asaba Expressway but also how Nigeria structures and awards future private-sector highway concessions.

Previous Post

Shaibu Hails Edo Queens After 7-0 Victory Over AS Garde Nationale

Next Post

Trump Orders US Flags At Half-Mast To Honour Dolly Parton

Obah Sylva

Obah Sylva

Next Post
Trump Orders US Flags At Half-Mast To Honour Dolly Parton

Trump Orders US Flags At Half-Mast To Honour Dolly Parton

About The Trumpet

The Trumpet is a Nigerian based national news media, owned, trademarked and operated by Elomaz Communications Limited with headquarters in FCT-Abuja and regional offices in Lagos and Delta States

Follow Us

Resources

  • Home
  • News
    • Breaking News
    • Headlines
    • Metro
    • Health
  • Politics
  • Business
    • Ecommerce
    • Economy
    • Start-up
  • Entertainment
  • Sports
  • Opinion
    • Religion
    • Columnists
    • Contributors
    • Editorial
  • Global
    • Climate
    • Culture
    • Tourism
    • Technology
    • Weather
    • Social Media
  • e-Edition

Recent News

2027 General Elections An Opportunity For Nigerians To Vote Out APC, Says Omo-Agege

2027 General Elections An Opportunity For Nigerians To Vote Out APC, Says Omo-Agege

August 26, 2026
Dolly Parton

Dolly Parton: From Poverty To Global Stardom, Extraordinary Life, Legacy Of Music Icon

August 26, 2026
  • Cookie Policy
  • Disclaimer
  • Contact us
  • About Us
  • Cookie Policy
  • Disclaimer
  • Contact us
  • About Us

© 2025 The Trumpet News Papers - Developed by VIS Nigeria.

No Result
View All Result
  • Home
  • News
    • Breaking News
    • Headlines
    • Metro
    • Health
  • Politics
  • Business
    • Ecommerce
    • Economy
    • Start-up
  • Entertainment
  • Sports
  • Opinion
    • Religion
    • Columnists
    • Contributors
    • Editorial
  • Global
    • Climate
    • Culture
    • Tourism
    • Technology
    • Weather
    • Social Media
  • e-Edition

© 2025 The Trumpet News Papers - Developed by VIS Nigeria.

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT